Input Needed On Fremont Siphon Site Design
At the Fremont Siphon Open House, the project team shared the new layout for the site of a permanent structure and access panels, and two design options. A structure for odor control must be constructed, and input at a January 2013 public design workshop developed two potential options which need input for deciding between them.